Geesinknorba Ltd are delighted to announce that they have secured an order for 27 Norba N4 23H25 TH LI-ON Power Pro bodies mounted on Electra chassis (converted Mercedes Econic) for the City of Manchester. This is the largest single order of full electric vehicles ever in the UK and demonstrates that Geesinknorba are the leading supplier and developer of alternative powered bodies in the Waste Management industry.
The order, which has been an 18-month collaboration between Electra/ NRG and Geesinknorba has been awarded based on the excellent reliability of our products and performance in the field on different waste streams, terrains and distances. We are convinced that our solutions perform exactly how the client prefers and it is testament to both Electra / NRG and Geesinknorba that Manchester City Council have placed their trust in our products.
There are many local authorities looking at alternative fuel vehicles in order to achieve a carbon neutral fleet using renewable energy sources and we are convinced that we have the products, knowledge and experience to provide exactly what they require today as well as looking to further enhance and develop our portfolio of products.